Optional
applicableApplicable plant operating states
Specific criteria that must be met
Description of the overall success criteria
The end state parameters that determine success or failure
References to engineering analyses supporting these criteria
Reference to the event sequence or family
Optional
isWhether this is for a risk-significant sequence (for CC-II differentiation)
Key safety functions that must be maintained
Radionuclide transport barriers that must be protected
Optional
usesWhether realistic criteria are used (CC-II for risk-significant, CC-I for non-risk-significant) This helps track compliance with capability category requirements
Represents the overall success criteria defined for preventing a release of radioactive material in each modeled event sequence and event sequence family.
Implements
SC-A1
Implements
SC-A2